
Project Details | Overview |
|---|---|
Customer | Mt Cass Wind Farm Project |
Sector | Renewable Energy |
Location | Waipara, North Canterbury |
Service | Long-Term Commercial Fleet Rental |
Fleet Supplied | Six Site-Ready 4x4 Utility Vehicles |
Application | Construction & Project Delivery |
Project Scale | 94 MW Renewable Energy Development |
The Mt Cass Wind Farm is one of New Zealand's largest renewable energy developments, bringing together contractors, engineers and specialist teams to deliver critical infrastructure in North Canterbury.
Operating on an active construction site requires vehicles that are more than capable off-road. They must meet strict site safety standards from day one while remaining reliable throughout the life of the project.
The project required a fleet that could be deployed immediately, equipped to site requirements, and fully supported for the duration of construction.
Cross Country supplied six new 4x4 utility vehicles on long-term rental, purpose-prepared for the demands of the Mt Cass Wind Farm construction site.
Rather than supplying standard vehicles, each ute was fitted with the equipment required to meet the project's safety and operational standards before being delivered to site.
This allowed project teams to begin work immediately with vehicles that were fully prepared for the environment they would be operating in.
Every vehicle was configured to meet the customer's site requirements before handover.
Each ute was equipped with:
By delivering vehicles ready for work, the project team avoided the time and cost of arranging modifications after delivery.
Backed by Cross Country's long-term rental programme, the fleet remains fully maintained and supported throughout the construction phase.
Cross Country's fleet continues to support construction of the Mt Cass Wind Farm, providing reliable transport for site personnel throughout the delivery of this major renewable energy project.
With purpose-prepared vehicles backed by ongoing maintenance and support, the project team can remain focused on construction while we manage the fleet.
Capability | Outcome |
|---|---|
Infrastructure Projects | Supporting delivery of a major renewable energy development |
Fleet Preparation | Vehicles delivered fully equipped to customer site specifications |
Safety Compliance | Site-ready fleet fitted with required safety equipment before delivery |
Long-Term Rental | Fleet supplied for the duration of the construction programme |
Fleet Management | Ongoing maintenance and support throughout the project |
Operational Readiness | Vehicles ready for work from day one |
Whether you're delivering renewable energy, construction, civil infrastructure or utilities, Cross Country can provide site-ready fleet prepared to your operational and safety requirements.
From a single project vehicle to a fleet deployed across multiple locations, we'll help keep your project moving.